Entitlement Card

The Entitlement(opens in new tab) card shows all your product suite entitlements.
 

Procedure

  1. From the sidebar, select Systems & ProvisioningProvisioning tab → Entitlement card. It contains the following columns:

    ●  Provisioning Product – The product type of a suite.
    ●  Contract Start – The start date of the contract. Also shown (in gray) is the contract end date.
    ●  Materials – The materials to be installed on the system. The corresponding contracts including the material are also shown here.
    ●  Entitlement System – The system number and name of the entitlement system are shown here. It commercially presents the product suite.
         Click to enter the System Details Page(opens in new tab).
    ●  Manage Applications – The navigation to the suite details page, including provisioning wizard of each application system of the suite.

  2. Use Search to find a specific entitlement, or click the Filter to select the filter criteria you want at the top of the list.
  3. Select Materials to see which materials are part of this product suite.
  4. Select an Entitlement System to see the system details page of the entitlement system.