Entitlement Card
The Entitlement(opens in new tab) card shows all your product suite entitlements.
Procedure
- From the sidebar, select Systems & Provisioning → Provisioning tab → Entitlement card. It contains the following columns:
● Provisioning Product – The product type of a suite.
● Contract Start – The start date of the contract. Also shown (in gray) is the contract end date.
● Materials – The materials to be installed on the system. The corresponding contracts including the material are also shown here.
● Entitlement System – The system number and name of the entitlement system are shown here. It commercially presents the product suite.
Click to enter the System Details Page(opens in new tab).
● Manage Applications – The navigation to the suite details page, including provisioning wizard of each application system of the suite.
- Use Search to find a specific entitlement, or click the Filter to select the filter criteria you want at the top of the list.
- Select Materials to see which materials are part of this product suite.
- Select an Entitlement System to see the system details page of the entitlement system.